Home › Home Remodeling Glossary › Building Permit
Licensing and Contracts term
Building Permit
Definition: A building permit is written approval from the county, issued in Carroll County by the Bureau of Permits and Inspections in Westminster, to start construction that changes a home's structure, systems, or footprint, with inspections required at set stages of the work.
What is a building permit?
Carroll County sets its permit rules in Chapter 170 of the County Code, which adopts the 2021 International Building Code and International Residential Code, as amended by the Maryland Building Performance Standards, and adds local changes on top.
One local change covers who can apply. Anyone listed as the contractor of record must be licensed. A homeowner may be listed instead, but only for a property listed in public records as their primary residence, and only after signing an affidavit saying so.
Why it matters
In Carroll County, re-roofing, re-siding, and replacing only deck boards do not need a permit, although the work still has to meet current code and the manufacturer's requirements. Additions, new decks, and structural changes go through permit review. Skipping a required permit can come back to bite you later, because unpermitted work can delay a sale or a refinance.
The county’s permit FAQ says the contractor listed on a permit is responsible for code-compliant construction and, for home improvements, must hold a Maryland Home Improvement Commission license. If you list yourself instead, you are solely responsible for code-compliant construction.
Work that does not need a building permit
County Code § 170.15 lists exempt work. Examples include:
- One-story movable sheds on skids of up to 150 square feet, kept out of drainage and utility easements, at least five feet from side and rear property lines, and meeting zoning, health and building code rules.
- Fences not over 10 feet high.
- Freestanding decks of up to 200 square feet, no more than 24 inches above grade, with no footings and not serving any door.
- Low-voltage wiring of 50 volts or less that is not part of a fire protection system.
Electrical and plumbing work have their own rules. The county FAQ says all electrical work needs a permit except replacing existing fixtures and low-voltage wiring, and that complete kitchen and bathroom remodels need a plumbing permit.
Timelines that can void a permit
Under the county’s amended Section 105.5, a permit becomes invalid if work does not start within one year of issue, is not finished within two years, or goes six months after starting without an inspection. The Building Official may extend these limits for good cause. An application that is not pursued is treated as abandoned six months after filing.
Inspections and penalties
Inspection requests must be made at least one business day ahead, and the contractor named on the permit may not start the next phase until the previous inspection is approved. If work starts without a permit, the permit fee may include a fine plus up to $500 for issuing the permit and up to $500 for each inspection that would have been required. The county FAQ adds that in some cases insurers may not cover damage claims for non-permitted work.
Learn more
These pages cover the project type that most often needs a full permit review, and the license the listed contractor needs.
Related Certified Home Remodelers services
Frequently asked questions
Who can be listed as the contractor on a Carroll County permit?
A licensed contractor, which for home improvements means an MHIC license. A homeowner may be listed for a property that is their primary residence in public records, but is then solely responsible for code-compliant construction.
How long is a building permit good for in Carroll County?
The county code voids a permit if work does not start within one year, is not completed within two years, or has no inspection for six months after work starts, unless the Building Official extends it for good cause.
Can I do my own electrical work?
Carroll County offers a homeowner registration for minor wiring in a home you own and live in, not a rental, up to 20 devices and excluding service and solar connections. You still need a permit and a signed affidavit.
Sources
- Carroll County Permits and Inspections: FAQs
- Carroll County: Building a New Home or Addition
- Carroll County: Building a Deck
Planning a project in Carroll County?
Ask about your remodel, addition, roof or siding project: Contact Certified Home Remodelers.
