Home › Home Remodeling Glossary › Home Addition

Building and Exterior term

Home Addition

Definition: A home addition is new, enclosed living space built onto an existing house, such as a family room, primary suite, or second story, tied into the home's structure, roof, and systems.

What is a home addition?

In Carroll County, an addition follows the permit path the county describes for a new home. The location must be approved by the Carroll County Zoning Administration and the Carroll County Health Department, so the structure sits far enough from property lines, septic systems and water infrastructure.

The applicant files a building permit and zoning application with an owner or contractor affidavit. After that, the licensed plumber, electrician and sprinkler contractors file their own plumbing, electrical and fire applications.

Why it matters

An addition is the project where permits, zoning, and engineering all meet. Setbacks from your property line, how the new roof ties into the old one, and whether your existing electrical service can carry the extra load all shape the design before any digging starts. In Carroll County, new living space also needs a Use and Occupancy approval before you move into it.

The county says permits can normally be issued within 10 to 15 business days when the application and construction documents are complete, accurate and code compliant, so a full plan set up front saves time.

What goes in the plan set

The county asks for two complete sets of construction plans drawn to scale, including:

  • Footing, foundation and framing plans.
  • A floor plan for each level with every room labeled by its use.
  • A cross section, a wall section and wall bracing details.
  • Front, rear and side elevations, plus total finished and unfinished square footage.
  • A note on whether the existing home has sprinklers.
  • A current Residential Energy Compliance Form.

Inspections along the way

At a minimum, the county lists building inspections for footing, foundation, draintile, slab, framing, insulation and final, plus electrical, plumbing and fire inspections. The county’s code amendments also require footings to sit at least 30 inches below grade.

When an addition needs sprinklers

Under the county’s amendment to Section R313.4, an addition that includes most elements of a dwelling unit, such as bedrooms, bathrooms and a kitchen, or that exceeds 50 percent of the home’s total square footage, needs a sprinkler system within the addition only. The Building Official may grant an exception where code-compliant emergency escape openings are installed throughout and the structure and egress windows are not more than one story above grade.

Learn more

These pages cover the permit, the insulation and the contract behind an addition.

Related Certified Home Remodelers services

Frequently asked questions

Who approves where an addition can go in Carroll County?

The county says the Zoning Administration and the Health Department review the location for distance from property lines, septic systems and water infrastructure.

How long does an addition permit take?

Carroll County says permits can normally be issued within 10 to 15 business days if the application and construction documents are complete, accurate and code compliant.

Does an addition need a sprinkler system?

Under the county’s code, it does if it includes most elements of a dwelling unit or exceeds 50 percent of the home’s total square footage, with the sprinklers required in the addition only. The Building Official may grant exceptions.

Sources

Planning a project in Carroll County?

Ask about your remodel, addition, roof or siding project: Contact Certified Home Remodelers.